This month started with a bang…really. A huge bang to my head or ego or whatever.
I’m 30.
Yay.
The last couple of weeks we have been working on the house, shopping for Christmas and trying to squeeze in a little family time.
And Elfie time
Can you believe this is our neighborhood? And you think we’re crazy…
We’ve also been steadily working towards our combo inspection and took one day off from that to work on our lath inspection (since that one is tomorrow).
See the paper on the front? That’s what’s going underneath our Hardi board.
The plumbing is officially done, thanks to So Cal Shower Pans who hot mopped our shower.
While Mike was at work I replaced the flapper on one of our old toilets because it wouldn’t stop running (high five to me and my old lady wisdom) and we are now back to using the in house toilet and shower. Unfortunately, during demo, we must have cracked the tank in the toilet in our old master bedroom and soon to be guest room (sorry Evie, I’m just not ready to let you be all alone downstairs…maybe one day).
Now that toilet will need to be replaced cause it is officially decommissioned (special thanks to the Captain who finally did it in).
Check out the fancy shmancy light switches though! Mike says you can tell a pro diy (oxymoron?) from a regular diy if they “clock” their screws.
I also stained the treads we are putting on the stairs and painted the wood for the risers (cuz I am super anal about finish work being pre-finished before it’s installed). I also bought myself a nice new random orbital sander for the job (happy birthday to me).
As I’m writing this post I’m sitting in the livingroom, drinking coffee, in my pj’s with the heater running cuz Mike is awesome and he did the whole HVAC downstairs by himself (I was there to take pictures and hold his tools). We still have the HVAC to complete upstairs, but for now this will do.
And the ducting:
Can you see my Halo?
Then Mike and I moved on to finishing all the electrical circuits. I nailed in all the can lights (there were 30), fixture and electrical boxes and Mike wired them up. We now have all of our lighting circuits complete throughout the entire house and some of our outlet circuits. Including the sconces (makes me feel so hoity toity to say “sconces”) in our stairway and master bathroom.
I am able to cook in my kitchen because, thanks to running gas, electrical and plumbing, it is now functional again! I’m serious! My outlets, lights, microwave, refrigerator, garbage disposal, gas stove and electric oven all work.
Look how happy pepper is for me!
Today I’m going to finish nailing in some straps and A35’s and some truss clips while M’s at work and the girls are at school. Tomorrow our drywall is being delivered. It’s like slow rewind through the demo phase!
Yay! I’m a little late but it’s really coming together!